TSE Customer Portal | Micron Fab10

Live Sync & View Only
Unique PCIDs Repaired πŸ—‚οΈ
49 Cards
180 Total Local Intakes
Full Success Rate 🟒
0%
0 cards ≥ 100 TDs (Good/Total)
Operational Rate 🟑
0%
0 (Good + Ongoing)/Total
Reported Success πŸ”΅
0%
0 (Good + Diff)/Total
KTSE HQ (Visibility) πŸ‡°πŸ‡·
0
0 Cards (Cheonan HQ RMA)
Bad Repair Rate πŸ”΄
0%
0 same DUT repeat fail
πŸ‡°πŸ‡·
Korean SME (KTSE Expert) On-Site Support Active WW34 ~ WW44+ (24/08/2026 ~ 31/10/2026 Active SME Window)

Specialized on-site engineering, 100% pin verification, and root-cause repair effectiveness tracking aligned to Micron Friday–Thursday Work Weeks.

πŸ“…

Daily Probe Card Return ETA & SLA Tracker

100% On-Time SLA

Day-by-day probe card intake, cleanroom return target (ETA), actual fulfillment dates, and turnaround lead time

⏱️
SLA Fulfillment 100% On-Time
🚚
Delivered & Closed 0 Cards
⚑
Active Bench Queue 0 In Progress
πŸ“ˆ
Avg Turnaround Lead Time 2.4 Days
# PCID (Click Map) P/N & Board S/N Date Received Scheduled Return (ETA) Repaired Date Turnaround Cleanroom SLA Status Effectiveness Technical Action Summary Drilldown

Quality Pareto Analytics & Repair Action Effectiveness

Frequency distribution across 474 DUTs, defect modes, and technical repair action success matrix

πŸ“Š Top 10 Failing DUTs Pareto (Wafer Matrix)
80/20 Rule Analysis
πŸ₯§ Defect Findings (Failure Root Cause) Pareto
Root Cause Share
⏱️
Cleanroom Delivery SLA Compliance
Target ETA vs Actual Repaired & Delivered Date
100%
On-Time Rate
πŸ› οΈ

Repair Action Effectiveness Matrix (Per Technical Decision Tree)

🟒 Full = Good / Total 🟑 Operational = (Good + Ongoing) / Total πŸ”΅ Reported = (Good + Diff) / Total
Technical Repair Action Intake Count 🟒 Good 🟑 Ongoing πŸ”΅ Diff πŸ”΄ Bad Full Success % Op Success % Reported % Effectiveness Breakdown
πŸ“…

Micron Work Week (WW) Trend & Effectiveness Evolution

WW27 ∼ WW44+ (Fri – Thu)

Micron Standard Work Week (Friday = Day 1, Thursday = Day 7) • Korean SME On-Site Support Active (WW34–WW44+)

πŸ’‘
Key Takeaway: 100% Pin Verification on Repeated DUTs Eliminated Repeat Failures

WW37–WW44+: Bad / Repeat Repairs maintained at 0 records. Optical PMI drift and Bin sorting variances are classified as Different Issues (πŸ”΅).

Cards ≥ 100 TDs
πŸ”„

Same-Issue Repeat Card Lifecycle & Resolution Audit 11 Repeat Cycles (WW28–WW36) 100% Contained & Resolved

Tracking every card that returned for the same pin/DUT, root cause analysis, containment actions, and when it was fully resolved by Fab10 & πŸ‡°πŸ‡· Korean SME.

🌏

Overseas Repair Work Week (WW) Analysis Dashboard

KTSE Korea HQ • Factory RMA

Tracking probe cards escalated to Korea Factory for multilayer ceramic (MLC) rebuilds, specialized factory re-work, and aging / CO2 verification

🌏
Total Overseas Intakes 0 Cards
🚨
Pending in Korea (Active RMA) 0 Cards
βœ…
Overseas Repaired & Returned 0 Cards
⚑
Special Repair (Aging / CO2) 0 Cards

πŸ“‹ Overseas RMA Cards Register 0 cards

Multilayer Ceramic Rebuilds • Factory RMA
# PCID (Click Map) P/N & Board S/N Date Received Return ETA Work Week RMA Reason & Findings (English) Factory Action Taken (English) HQ Sub-Status & TAT RMA Status Drilldown

πŸ“‹ Probe Card Service Records 0 items

πŸ”
Filter by Effectiveness:
Filter by Status:
Special Repair & Flags:
No. PCID (Click Map) P/N & Board S/N Date In Repaired Date Work Week Touchdowns Repair Effectiveness Defect & Findings (English) Action Taken (English) Special Repair & Flags Status History of PCID
Showing 1 - 25 of 149 records